Skip to main content

Amanullah Khan Ghazi



  • AMANULLAH KHAN GHAZI
  • HAJI AMANI KHAN
  • MECHANICAL ENGINEER
  • DAELIM K.S.A QA/QC SUPERVISOR
  • TAROO JABBA NOWSHERA
  • December 11 1975
  • Primary Secondary School SRE/I (Shifa)
  • 10
  • B
  • 1989
  • ghazi_xnavy@yahoo.com
  • https://www.facebook.com/amanullahkhan.ghazi
  • Amanullah Khan Ghazi
  • Street Address: H.No 33 Street#6 Sector-II
    Street Address Line 2: Haroon Bahria naval Colony
    City: Karachi
    State / Province: Sindh
    Postal / Zip Code: 5470
    Country: Pakistan

Amanullah Ghazi's Overview

Current
  • Quality Control Supervisor at Daelim Industrial
Past
  • Quality Controle Inspector (Piping) at Daelim Industrial
  • QA/QC Engineer (Piping) SAP# 70014152 at Tecnicas Reunidas
  • HSE Manager at Sinopec International Petroleum do Brasil Ltda.
  • QA/QC Engineer (Piping) SAP# 70014152 at Technip
  • QA/QC Engineer (Piping) at Petrokemiya (SABIC)
  • QA/QC Engineer (Mechanical) at Descon Engineering Limited
  • QA/QC Engineer at Modern Arab Construction
  • QA/QC Piping Engineer (Mechanical) at Saudi Aramco
  • Marine Equipments Specialist & Safety Engineer at Saudi Aramco
  • Lieutenant Pakistan Navy at Pakistan Navy
Education
  • National University of Science and Technology
  • Pakistan Naval Academy (PNA)
  • Pakistan Navy Junior Cadet College
  • Pakistan Navy Boys Sec.School
Recommendations
2 people have recommended Amanullah
Connections
500+ connections
Websites
  • Personal Website
  • Company Website
  • Company Website

Amanullah Ghazi's Summary


A result oriented professional with +14 years of International exposure in oil & Gas field in Quality Inspection Department.
Proven track record of Rotating Equipment Inspection, Piping Inspection, Structural and material Inspections.
Aware of Saudi Aramco, JERES, SABIC and QP standards, operational policies, planning & implementing effective control measures in the QA/QC Department.
Expertise in carbon steel, stainless steel, RTR and PVC piping installation as per required standards and approved procedures.
Knowledge of preparing the Project QCP and methods of statements for different activities.
Excellent written, communication, inter personal, liaison and problem solving skills with the ability to work in multi cultural environment.
Execute all meeting in QA/QC departments including weekly and monthly meeting and daily inspection analysis.
Work experience of Saudi Aramco, SABIC and Qatar Petroleum Projects.
Saudi Aramco approved QA/QC Inspector for Piping with SAP#.
Aware of QP standards and procedure

Amanullah Ghazi's Experience

Quality Control Supervisor

Daelim Industrial

Public Company; 1001-5000 employees; Oil & Energy industry
June 2013Present (9 months) Jubail Saudi Arabia
 Preparing valves for witness/inspection of valve testing as per required standards.
 Witness/inspection for valves testing as per API 598, API6D or required standards.
 Inspection of joint fit-up preparation prior to full welding and pipe spool cleanliness before erection.
 Leadership in communication with junior and senior staff, coordination and team work arrangement with clients /sub contractors.
 Inspection of all Mechanical Materials.
 Carry out Hydro test and gravity test.
 Preparation of documents for material inspection.
 Witness/inspection of the installation of Mechanical equipments.
 Internal inspection of pumps inside the tanks.
 Witness/inspection for the removal of Mechanical equipments.
 Monitoring and evaluating the quality of work accomplished by the construction.
 Responsible for performing the required inspection and documentation of mechanical/underground piping in according to the required standards.
 Witness/Inspection of hydro testing/gravity testing of piping system. Preparation of hydro test/gravity test packages prior to hydro test/gravity test.
 Checking piping installation as per inspection check list and according to the Saudi Aramco standards.
 Tagging and labeling of all equipments valves, pipes and other accessories using P&ID and other related drawings.
 Preparing valves for witness/inspection of valve testing as per required standards.
 Witness/inspection for valves testing as per API 598, API6D or required standards.
 Inspection of joint fit-up preparation prior to full welding and pipe spool cleanliness before erection.
 Inspection of the laminated joints of FRP Pipes as per manufacturer’s specifications.
 Punch listing of line as per drawing requirements.
 Responsible for implementing various fields testing of piping.
 Responsible for the confirmation of quality as per QC standards
 Making as build isometric drawing as per actual site condition.

Quality Controle Inspector (Piping)

Daelim Industrial

Public Company; 1001-5000 employees; Oil & Energy industry
February 2013May 2013 (4 months) SADARA Project Jubail K.S.A
  Monitoring and evaluating the quality of work accomplished by the construction.
 Responsible for performing the required inspection and documentation of mechanical/underground piping in according to the required standards.
 Witness/Inspection of hydro testing/gravity testing of piping system. Preparation of hydro test/gravity test packages prior to hydro test/gravity test.
 Checking piping installation as per inspection check list and according to the Saudi Aramco standards.
  Preparing valves for witness/inspection of valve testing as per required standards.
 Witness/inspection for valves testing as per API 598, API6D or required standards.
 Inspection of joint fit-up preparation prior to full welding and pipe spool cleanliness before erection.
  Punch listing of line as per drawing requirements.
 Responsible for implementing various fields testing of piping.
 Responsible for the confirmation of quality as per QC standards
 Making as build isometric drawing as per actual site condition.
 Responsible for performing the required inspection and documentation of mechanical/under ground piping in according to the required standards.
 Witness/Inspection of hydro testing/gravity testing of piping system. Preparation of hydro test/gravity test packages prior to any test.
  Tagging and labeling of all equipments valves, pipes and other accessories using P&ID and other related drawings.
 Witness/inspection for valve testing as per required standards.
 Witness/inspection for valves testing as per API 598, API6D or required standards Inspection of joint fit-up preparation prior to full welding and pipe spool cleanliness before erection.
 Punch listing of line as per drawing requirements.
 Responsible for implementing various fields testing of piping.
 Responsible for the confirmation of quality as pr QC standards
 Making as build isometric drawing as per actual site condition.

QA/QC Engineer (Piping) SAP# 70014152

Tecnicas Reunidas

Privately Held; 5001-10,000 employees; Oil & Energy industry
December 2011May 2013 (1 year 6 months) Manifa Jubail
QA/QC Piping Inspector

Ensure required quality standards of piping and supervise all aspects of various field testing.
Ensure planning, monitoring and inspection of piping to ensure compliance with quality standards and procedures.
Preparation/monitoring inspection schedules and responsible for the conformation of quality in accordance with Quality control standards.
Ensure all piping elements that they are properly in the correct part of the piping system.
Co-ordinate with construction staff for upgrade the work production in projects.
Handle out door emergency duties and plan to execute with committees.
Preparation of Hydro /Gravity Test packages for the systems.
Impart appropriate training and demonstration to new workers in the department.


Rotating & Mechanical Equipments Inspection

Ensure profitability of operations and supervise all aspects of rotating equipments including pumps, compressors, motors and centrifuges.
Ensure planning, monitoring and inspection of rotating equipments to ensure compliance with quality standards.
Preparation & monitoring equipments inspection schedules and responsible for repair, maintenance and inventory control.
Co-ordinate with operating staff for upkeep all rotating equipments in perfect working condition.
Handle outdoor emergency duties and plan to execute with committees.
Impart appropriate training and demonstration to new workers.

HSE Manager

Sinopec International Petroleum do Brasil Ltda.

Privately Held; 51-200 employees; Oil & Energy industry
October 2011December 2011 (3 months) Yanbu Saudi Arabia
Managing all over the HSE department during the project.
2.Responsible for the safety of all men and material of the company and directly answerable to Project Manager in any issue related safety.
3.Prepare, revise/update and implement the Safety, Health and Environmental programs.
4.Prepare, revise/update and implement the JSA and Safety Plans.
5.Organized, supervise and perform daily, weekly, monthly or any other inspection related to Safety, Health and Environmental.
6.Report to the Project Manager as safety department’s representative regarding any issue in the absence of Safety Manager.
7.Organized, schedule and prepare the agenda of weekly tool box meeting for the Project staff and all employees.
8.Attend regularly scheduled weekly and monthly meeting with the safety department of company as well with the client.
9.Timely reported on any accident/incident related to the project.
10.Provide changing in the safety requirements.
11.Provide first aid at the scene of accident/incident.
12.Take part in discussion on injury, damage and loss control.
13.Inspect the work site on daily basis to report and correct the unsafe act or condition.
14.Manage all the safety aspect for Confined Space Entry to tank.
15.Organized Emergency Rescue Team
16.Investigate work accidents, injuries or occupational diseases to determine causes and preventive measures.
17.Report or review findings from accident investigations, facilities inspections or environmental testing
18.Inspect facilities, machinery and safety equipment to identify and correct potential hazards and to ensure safety regulation compliance
19.Conduct or coordinate worker training in areas such as safety laws and regulations, hazardous condition monitoring and use of safety equipment
20.Review employee safety programs to determine their adequacy.
21.Interview employers and employees to obtain information about work environments and workplace incidents.

QA/QC Engineer (Piping) SAP# 70014152

Technip

Public Company; 10,001+ employees; TKP; Oil & Energy industry
July 2010September 2011 (1 year 3 months) Jubail Saudi Arabia
Preparing valves for witness/inspection of valve testing as per required standards.
Witness/inspection for valves testing as per API 598, API6D or required standards.
Inspection of joint fit-up preparation prior to full welding and pipe spool cleanliness before erection.
Leadership in communication with junior and senior staff, coordination and team work arrangement with clients /sub contractors.
Inspection of all Mechanical Materials.
Carry out Hydro test and gravity test.
Preparation of documents for material inspection.
Witness/inspection of the installation of Mechanical equipments.
Internal inspection of pumps inside the tanks.
Witness/inspection for the removal of Mechanical equipments.
Monitoring and evaluating the quality of work accomplished by the construction

QA/QC Engineer (Piping)

Petrokemiya (SABIC)

Public Company; 10,001+ employees; Chemicals industry
July 2009June 2010 (1 year) Jubail KSA
Preparing valves for witness/inspection of valve testing as per required standards.
Witness/inspection for valves testing as per API 598, API6D or required standards.
Inspection of joint fit-up preparation prior to full welding and pipe spool cleanliness before erection.
Leadership in communication with junior and senior staff, coordination and team work arrangement with clients /sub contractors.
Inspection of all Mechanical Materials.
Carry out Hydro test and gravity test.
Preparation of documents for material inspection.
Witness/inspection of the installation of Mechanical equipments.
Internal inspection of pumps inside the tanks.
Witness/inspection for the removal of Mechanical equipments.
Monitoring and evaluating the quality of work accomplished by the construction

QA/QC Engineer (Mechanical)

Descon Engineering Limited

Privately Held; 10,001+ employees; Construction industry
November 2008June 2009 (8 months) Qatar
Preparing valves for witness/inspection of valve testing as per required standards.
Witness/inspection for valves testing as per API 598, API6D or required standards.
Inspection of joint fit-up preparation prior to full welding and pipe spool cleanliness before erection.
Leadership in communication with junior and senior staff, coordination and team work arrangement with clients /sub contractors.
Inspection of all Mechanical Materials.
Carry out Hydro test and gravity test.
Preparation of documents for material inspection.
Witness/inspection of the installation of Mechanical equipments.
Internal inspection of pumps inside the tanks.
Witness/inspection for the removal of Mechanical equipments.
Monitoring and evaluating the quality of work accomplished by the construction

QA/QC Engineer

Modern Arab Construction

Partnership; 1001-5000 employees; Construction industry
July 2006November 2008 (2 years 5 months) Khobar Saudi Arabia
Preparing valves for witness/inspection of valve testing as per required standards.
Witness/inspection for valves testing as per API 598, API6D or required standards.
Inspection of joint fit-up preparation prior to full welding and pipe spool cleanliness before erection.
Leadership in communication with junior and senior staff, coordination and team work arrangement with clients /sub contractors.
Inspection of all Mechanical Materials.
Carry out Hydro test and gravity test.
Preparation of documents for material inspection.
Witness/inspection of the installation of Mechanical equipments.
Internal inspection of pumps inside the tanks.
Witness/inspection for the removal of Mechanical equipments.
Monitoring and evaluating the quality of work accomplished by the construction

QA/QC Piping Engineer (Mechanical)

Saudi Aramco

Privately Held; 10,001+ employees; Oil & Energy industry
March 2005August 2005 (6 months) Riyadh Refinery Saudi Arabia
Preparing valves for witness/inspection of valve testing as per required standards.
Witness/inspection for valves testing as per API 598, API6D or required standards.
Inspection of joint fit-up preparation prior to full welding and pipe spool cleanliness before erection.
Leadership in communication with junior and senior staff, coordination and team work arrangement with clients /sub contractors.
Inspection of all Mechanical Materials.
Carry out Hydro test and gravity test.
Preparation of documents for material inspection.
Witness/inspection of the installation of Mechanical equipments.
Internal inspection of pumps inside the tanks.
Witness/inspection for the removal of Mechanical equipments.
Monitoring and evaluating the quality of work accomplished by the construction

Marine Equipments Specialist & Safety Engineer

Saudi Aramco

Privately Held; 10,001+ employees; Oil & Energy industry
January 2004December 2004 (1 year) Rastanura Marine Port Saudi Arabia
Look after the MMS of all Marine vessels’ equipments including main Engines, Diesel Engines, Pumps, Compressor and Life safety arrangements.
Update the records in SAP system for Marine vessels’ equipments including main Engines, Diesel Engines, Pumps, Compressor and Life safety arrangements.
Preparation of documents for arrangement of required spare parts.
Monthly and weekly inspection of equipments.
Look after the installation of pumps and small mechanical equipments in Barges.
Make the safety tool box talk for the mechanical department

Lieutenant Pakistan Navy


Pakistan Navy

Government Agency; 10,001+ employees; Shipbuilding industry
January 2000September 2003 (3 years 9 months) Karachi Pakistan
a. Assistant Engineering Officer of the ship(Jan 2000 to Dec 2001)

Job and Responsibilities:
I worked as Assistant Engineering Officer of the ship for two year. I am having experience of corresponding to the official mails. I was responsible for men & materials of Engineering Department. I involved in the procurement of engineering parts. I also worked assistant to the Chief Engineering officer. I was appointed as Maintenance Officer. I worked on ‘D’ type boiler having a working pressure of 44 Bar. During my period I was responsible for the maintenance of following equipments and I have experience on these equipments.

Twin spool steam turbine.
Main condenser (Heat exchanger) of the ship.
Economical evaporator for producing fresh water.
Low pressure Reciprocating/Centrifuge compressors.
Different types of pumps.
Double reduction gearbox system.

I was transferred to the Gas turbine ship as I did GT Module Course so I worked as shift in charge of Gas Turbine Engine. I am having experience of Olympus and Tyne Gas Turbine Engines. I was responsible for maintenance and up keeping of G.T section.


I also worked as Diesel Engine Overhauling Supervisor. I am having experience of major overhaul & top overhaul of Caterpillar, EMD and Cummins Engines. I was also responsible for the ship electrical generation & distribution department.
b. Deputy Manager Fabrication shop (piping) & Paint shop (Jan 2002 to Oct2003)
Job and Responsibilities:
Tagging and labeling of all equipments, valves and pipes.
Responsible to carry out hydro test of piping.
Making of as build Isometric drawing as per actual condition.
Ship super structure & hull bottom painting, grit/sand blasting.
Fabrication of piping accessories according to the Isometric drawings.
Machining and casting of small items.
Hull protection of Marine vessels.
Human Resource Management of the workers

Amanullah Ghazi's Projects

  • SADARA

    • February 2013 to Present
    Team Members: Amanullah Ghazi
    World Largest petrochemical Project. A joint venture by Saudi Aramco and DOW engineering. Located at Jubail-2 industrial Area Saudi Arabia.
  • Manifa Project

    • November 2011 to January 2013
    Team Members: Amanullah Ghazi
    Located at Manifa. This was Saudi Aramco project.
  • Khurais Cruid Facilities Project

    • June 2007 to November 2008
    Team Members: Amanullah Ghazi

Amanullah Ghazi's Publications

  • Taqaza-e-Qismat

    • Karachi Pakistan
    • December 11, 2011
    Authors: Amanullah Ghazi, Amanullah Khan Ghazi
    By the blessing of ALLAH I planned to write a book on my life or you can say an autobiography. The name of this book is TAQAZ-E-QISMAT, its comprises 6 chapters,
    Chapter 1….. About my life stories from date of birth till class X.
    Chapter2……About life stories of Pakistan Navy life
    Chapter3…….About the story of leaving Pakistan Navy and Join Civil life at Saudi Arabia
    Chapter4…....About my unsuccessful love
    Chapter5…….About my life Partner
    Chapter6……About life is Saudi Arabia less

Amanullah Ghazi's Honors and Awards

  • Junior Officer Staff Duty Course

    Pakistan Navy Unit PNS Rahnuma Karachi Pakistan
    • December 2001
  • Recognition Certificate from Saudi Aramco

    Saudi Aramco
    • August 2004
  • Letter of Appreciation from Saudi Aramco

    Saudi Aramco
    • September 2004
  • Best Employee of the year 2004

    SAS General contracting Est Al-Khobar Saudi Arabia
    • December 2004
  • Qualified Work Permit Receiver from Saudi Aramco

    Saudi Aramco
    • March 2005
  • Approved QA/QC inspector (RTR) from Saudi Aramco

    Saudi Aramco
    • July 2007
  • Awarded letter of Safe Man Hours from SNAMPROGETTI Khurais project

    Saudi Aramco
    • September 2008
  • Qualified (PTW) Permit to work from Qatar Petroleum

    Qatar Petroleum
    • February 2009
  • Approved QA/QC inspector (RTR) from SATORP

    Saudi Aramco Total Refining Project
    • July 2010
  • Approved QA/QC Inspector(Piping) from Saudi Aramco Manifa Project

    Saudi Aramco
    • December 2011

Amanullah Ghazi's Courses

  • B.E (Mech), Mechanical Engineering

    National University of Science and Technology

    • Engineering Competency Certificate from PNS MOAWIN (PAKISTAN).
    • Boiler Engine Room Competency Certificate from PNS MOAWIN (PAKISTAN)
    • Gas Turbine Module Course from PNS KARSAZ (PAKISTAN)
    • Junior Officer Staff Duty Course from PNS RAHNUMA (PAKISTAN)
    • Fire Fighting and Damage Control Course from PNS KARSAZ (PAKISTAN)
    • Instructional Technique (officer) Course from PNS RAHNUMA (PAKISTAN)
  • S.S.C, Science

    Pakistan Navy Boys Sec.School

    • Secondary School Certificate
  • QA/QC Engineer (Piping) SAP# 70014152

    Technip

    • RTR Pipe joints Assembling Course from (FPI) Future Pipe Industries (SAUDI ARABIA)
    • DTRA Daily Task Risk Assessment Course from Technip (Saudi Arabia)
    • Fire warden course from Technip (Saudi Arabia)
    • Safety Leadership for Supervision from Technip (Saudi Arabia)
    • Work at Height Training from Technip (Saudi Arabia)
  • QA/QC Engineer

    Modern Arab Construction

    • RTR & FRP Handling & Assembling Course from BOND STRAND (SAUDI ARABIA)
  • Marine Equipments Specialist & Safety Engineer

    Saudi Aramco

    • Rotating Equipments Inspector Course from SADAF (SABIC) (SAUDI ARABIA)
    • Basic Alignment Orientation course from SAUDI ARAMCO. (SAUDI ARABIA)
  • QA/QC Engineer (Mechanical)

    Descon Engineering Limited

    • Hydrogen Sulfide/BA orientation course from QISC Qatar International safety Centre (QATAR)
    • Confined Space Entry Course form National Academy of Professional Training (QATAR)
    • Basic Fire Fighting Course from QISC Qatar International safety Centre (QATAR)
    • Advance First Aid Course from NAPT National Academy of Professional Training (QATAR)

Comments

Popular posts from this blog

Bahria Model School Sabir

Bahria Model School SABIR Mont to SSC (Karachi and Federal Board) MissionTo impart knowledge and to improve the values of students with higher and noble ideas of  Islam to socializing them in to well sounded person, ever-ready to serve the nation and the humanity. Description In 1953 the foundation of a the school was laid in SABIR SRE.   In 2010 all PNET schools were merged into one School as “Bahria Model School SABIR SRE”.   The School have five sections/Units – Junior Wing (Beg to Class 2) – Primary Wing (Class 2 to 5) – Girls Wing (Class 6 to 10 Girls) – Boys Wing (Class 6 to 10 Boys) – Federal Group (Class 6 to10 Boys & Girls)   The Building has Four blocks, three floors in each block with large and airy west open classrooms. The School is situated in serene, peaceful and pollution free environment. The School has advance Physics, Chemistry, Biology, Computer and MEDIA Lab with highly sophisticated equipments to meet the goal of modern era. Ot

Pak Navy School Majeed SRE (SRE II) Greater Karsaz Karachi

Pakistan Navy Boys Secondary School SRE II Pakistan Navy Girls Secondary School SRE II Pakistan Navy Primary Secondary School SRE II Pakistan Navy M A Rangoonwala Trust Special Children School Now Bahria Model School No 2 During the tenure of  Commodore M Bashir Chaudhry  as Commandant of the Pakistan Navy, Chaudhry took the initiative to extend the education facility to special children by establishing a school in the residential area of PNS Karsaz. [2]  This special children's school is spread over a 60,000 square feet (5,600 m 2 ) covered area and has been exclusively designed to meet all future requirements, matching international standards. The school caters to children with varying limitations, such as mental retardation, learning disabilities, physical disabilities, hearing impairment or visual disabilities. The school is equipped with a computer laboratory, science laboratory, occupational therapy/physiotherapy hall, sensory room, auditory room, activity r

Group photo 1992 Pakistan Navy School SRE 1 Karachi

Group photo 1992 Pakistan Navy School SRE 1 Korangi Road Karachi.      Photo send by  Waris Ali